COVER STORY



        pneumatic control valves in power plants. It is critical that there is no   until the wind farm is up and running, giving the customer the benefit
        oil or moisture in the air as this could cause unscheduled downtime,   of its technology and service excellence.
        which is very costly from a productivity, time and financial perspective.
           There has also been a significant shift in the power production   ‘Masters of knowledge’ for customers’ power-related
        sector in favour of the use of Class 0 oil-free compressors: “Our   requirements
        customers have become increasingly aware of the risks involved with   The global trend towards sustainability and decarbonisation has driven
        any oil or contaminant carry-over, and the eradication of this potential   companies to search for fuel-efficient solutions, putting power products
        issue means that the hire of the Class 0 oil-free compressors – because   front and centre in many vertical industries across the globe, including
        of their ability to produce clean, pure, contaminant-free dry air – has   in the power sector.
        become almost the default industry standard today.”       Knowledge in this field is therefore essential for companies
                                                               such as Rand-Air as customers who require generators and all other
        Assisting with customers’ prime power set-ups          electrically-driven equipment require the right advice, based on high
        Thorne explains: “Even though we supply standby generators, Rand-  levels of knowledge and power-related expertise, also referred to in
        Air’s focus, as part of the Atlas Copco Speciality Rental (ASR) division   this context as ‘power competence’.
        has always been on the prime power market.                “It is for this reason,” says Thorne, “that we participated recently in
           To this end, we have offered our customers – including those   a global Competence Development Programme (CDP), recognising that
        in the renewable energy sector – an Atlas Copco ‘TwinPower’   we needed to upskill our own power competence, and our approach to
        containerised generator solution, featuring two 500 kVA generators   customers’ power-related requirements.
        in each container.”                                       The course, also known as Megawatt Masters, was specifically
           This containerised generator solution gives a very compact   designed to educate Atlas Copco Specialty Rental division’s sales teams
        footprint, unrivalled versatility, optimised performance and excellent   worldwide, boosting their technical competence and knowledge of
        fuel economy in demanding modular power plant (MPP) applications.   the company’s power products range, applications and related market
        In addition, the two modules inside the container can be synchronised   opportunities.
        so that it is possible to supply either 1100 kVA or 550 kVA – a versatile   “The training consists of a range of modules on different levels,
        and portable cost- and fuel-saving option for the customer.   including master’s sessions, where an international network of experts
           “Our popular TwinPower generator provides power capacity which   consults as a team. The Megawatt Masters training will therefore assist
        can conveniently be adapted to suit the customer’s needs. Therefore,   Rand-Air team members to more accurately align our solutions with
        when they do not need to run the whole plant, one generator can be   customers’ current and longer-term power requirements – including in
        used. If they need to top up power thereafter, they can run the second   the power sector,” he adds.
        generator. Our TwinPower generator is thereby an extremely fuel-
        efficient solution for a customer’s prime power set-up requirements.”   A ‘powerful partnership’ for the future
                                                               “At Rand-Air, we are always open to new ways of servicing our
        Lighting towers and power generation: a renewable energy   customers’ power-related needs, striving continually to give them the
        case study                                             most effective solutions for their unique requirements,” says Thorne.
        “We have definitely seen an increase in the demand for renewable   “With regards to the energy sector, we aim to continue supplying
        energy sources such as wind and solar farm projects – both for the   its ongoing power requirements needs whenever, and wherever,
        development and maintenance of these facilities – in the Northern and   required. We remain in close contact with this key industry segment as
        Western Cape provinces,” says Thorne.                  its first choice of rental when it comes to any compressor, generator,
           “For example, we have been closely involved in supplying rental   pumps, or lighting tower enquiries.
        equipment for the start-up phase of a wind farm in a remote and   In this way, we will continue playing our part in helping to create
        quite inaccessible area of the Eastern Cape. This wind farm project   and maintain a more stable and reliable national power supply in
        forms part of a 700 MW wind capacity renewable tender which, when   South Africa, be it from conventional, grid-based or renewable sources,
        completed and running at full capacity, will generate more than 460   moving forward,” he concludes.    n
        GWh of clean electricity, annually. The project involves the erection of
        46 wind turbines in this remote area of the country,” he says.  Contact Byrone Thorne, Rand-Air, Tel 011 345-0700,
           Wind turbines, being immense, are manufactured in sections or   byrone.thorne@randair.com
        modules and then assembled close to the project site. The contractor
        on the project responsible for assembling the different components of
        the massive turbines, generally works at night, when the site is cleared
        of riggers and the wind shear factor is lower.
           Through its Durban branch, Rand-Air supplied 12 QLV lighting
        towers as well as portable power for the on-site offices, in the form of
        four 60 kVA generators, complete with distribution (DB) boards for use
        in the on-site assembly of the wind turbines.
           “The customer was very impressed that Rand-Air is fully ISO-
        certified, as well as with our in-depth safety inductions with the entire
        turbine assembly crew plus Rand-Air’s own technicians. The customer
        was also very satisfied with the team’s technical qualifications and
        competency levels,” Thorne comments.
           The rental contract remains ongoing and Rand-Air will be on-site