Page 37 - EngineerIT December 2022
P. 37

NEWS DIGEST


        Teraco breaks ground on JB5 – A 30MW data


        centre expansion to the Isando Campus


        Teraco’s new development brings a highly advanced and sustainably designed
        data centre to the Isando Campus




             eraco: A Digital Realty Company,                                                   Artist’s rendition of JB5
             Africa’s largest interconnection
        Thub and vendor-neutral data
        centre provider, announced that
        construction has commenced on a new
        hyperscale data centre facility with 30
        megawatts (MW) of critical power load
        at its Isando Campus in Ekurhuleni, east
        of Johannesburg. The facility, known
        as JB5, is scheduled for completion in
        2024 and will incorporate the latest
        environmentally sustainable cooling and
        water management designs.
           CEO of Teraco, Jan Hnizdo, said
        that the company continues with solid
        growth, as enterprise and hyperscale
        requirements continue apace due to   network service providers, peering at NAPAfrica, regional IXPs, content delivery networks
        sustained demand for hybrid cloud    and cloud provider on-ramps. Hnizdo says that this expansion aims to further support
        deployments and the adoption of cloud   sub-Saharan enterprises by advancing their digital transformation strategies and enabling
        services in Africa. “South Africa is a   global cloud providers to expand their footprints —spurring innovation.
        springboard for cloud provision into   JB5 has been designed to put sustainability first and minimise its environmental
        Africa and, as a result, has become   footprint. JB5 will incorporate the latest state-of-the-art cooling designs, a closed-loop
        the technology and data centre hub   chilled water system that incorporates 100% free air cooling. This design will bring about
        for sub-Saharan Africa. Massive global   industry-leading PUEs, thereby reducing the energy consumed and limiting water used in
        investments into undersea cables, like   the ongoing cooling process to zero.
        Equiano and 2Africa, further strengthen   JB5 is the latest expansion to Teraco’s growing data centre platform and takes critical
        this position. This will enable global cloud   power load capacity at Teraco facilities to 156MW, which includes the Isando Campus
        providers to service not only the South   facilities; JB1/JB3/JB5 (70MW), Bredell Campus JB2/JB4 (64MW), Cape Town Campus
        African market but also the rest of the   CT1/CT2 (21MW) and Durban (1MW).
        sub-Saharan African region.”           Organisations working to accelerate their digital transformation utilise Teraco to
           “Teraco is committed to growing its   dynamically scale their IT infrastructure, adopt hybrid multi-cloud architectures and
        capacity footprint across its core hubs.   interconnect with strategic business partners within the Platform Teraco ecosystem of
        We ensure our clients have the flexibility   global and local clients.
        to scale and take advantage of the digital
        transformation across sub-Saharan     Key Facts
        Africa. We continue to invest significantly   •  JB5 comprises 55,000sqm of building structure serviced by 120MVA of utility
        in the region’s ICT infrastructure and   power supply.
        have built Africa’s largest data centre   •  Strategically located in the Isando Campus alongside JB1 and JB3, Africa’s most
        platform. We take pride in enabling open   highly interconnected facilities with over 14,000 interconnects.
        access interconnection and providing   •  JB5 will be built in a single phase and includes 12x 1,000 m2 halls.
        world-class data centre infrastructure for   •  JB5 is a significant addition to South and sub-Saharan Africa’s data centre footprint.
        all our clients,” Hnizdo said.        •  The new data centre development is being built in line with global hyperscale
           The JB5 facility is Teraco’s eighth   requirements.
        data centre development located in the   •  It will augment the existing portfolio of ISO9001, ISO27001, ISO50001, ISO14001,
        heart of Ekurhuleni’s Aerotropolis. It is   PCI-DSS and ISAE3402-certified data centre facilities.
        here that Teraco’s data centres already   •  JB5 will feature environmentally conscious designs and monitoring technology to
        provide access to a wide choice of       reduce water use and improve energy efficiency.


                                                 EngineerIT | December 2022 | 37
   32   33   34   35   36   37   38   39   40