Page 6 - IFV_Issue 3_March_2022
P. 6
Estate News
WORKERS WALKING THROUGH
ANTI-PASS BACK FEATURE OF THE
BIOMETRIC SYSTEM
The Estate Management has become
aware that some of the workers in
the estate do not walk through the
turnstiles when accessing the estate.
These workers gain access to the estate
in a resident’s vehicle. This results in the
worker not able to enter the estate using
the biometric system, due to the anti-
pass back feature in the system.
All workers must use the biometric
system each time they enter and leave
the estate. Should you, as a resident, take
your worker out or bring your worker
into the estate, you are requested to
stop at the gate and ensure that your
worker goes through the turnstile, using APPLICATIONS – SOLAR to match the wall colour. This must
their fingerprint so the biometric system There is an increase in the number of be noted on the plan.
records both their entry and exit. residents wanting to install solar panels 5. All solar panels must be flush-
at their homes in the estate. mounted and in line or parallel to
SNAKES If you are considering installing the existing roof pitch. To be noted
In the last month, there were some solar powered units, there is an on the plan.
incidents where residents found snakes application form that must be 6. In the case of a solar water
in their homes. completed and submitted to the heating system, all geysers to be
If you find a snake in your house or Estate Administration. The form is concealed within the roof space.
on your property, feel free to contact available from the Estate Office. All pipe work to be trunked and
Security. You can also contact Jaco The following information needs to be painted externally. To be noted on
Britton on 079 287 9294 directly, as he submitted on the application form: the plan.
is a snake catcher and he can assist you. 1. Solar panel positions to be indicated Other points for the residents to
on a roof plan. consider for their own records. These are
2. The roof plan/sketch does not not HOA requirements.
have to be done professionally. It is 7. Does the installer have a PV Green
merely for administrative purposes Card to effect the installation?
but must have sufficient details, 8. A Certificate of Compliance would
such as: site boundaries, North be required for all electrical work.
point, and position of residence on The committee that considers these
the site. applications meets on Wednesdays.
3. Solar water/PV system to be Residents are kindly requested to
specified with panel sizes. submit the application form, together
4. All cables and pipes to be neatly with the relevant documentation, by the
trunked and trunking to be painted previous Tuesday.
SMALLS – Advertising in The Villager
There is an opportunity for residents to place Classified/Smalls
advertisements in The Villager for household workers, tutoring, pet sitting
or other services. Contact the Estate Office regarding the placement of the
Smalls. Businesses wanting to place paid Classified adverts in the Service
Providers section on that page may contact the publishers of The Villager –
you will find the contact details on the Contents page of the magazine.
4 • Issue 3 2022 • The Villager