Page 9 - Landscape SA 103
P. 9

PROJECT






































                                     Traffic island adding greenness and texture to a hard area of the site


           maintenance, more compact  Sanseviera
           for a slick appearance which suits this
           modern building.  Two planters were
           introduced on the northern façade, with
           stainless steel creeper ladders having the
           same intent of creating green belts.

           Anthony  Teuchert of Atlanticscapes was
           responsible for all the balcony planting.
           In terms of hard landscaping, this
           comprises exposed aggregate concrete
           pedestrian pathways, stone cladding
           to the lower facades of  The Ridge, and
           retaining walls. The southern façade of The
           Ridge has planters on slab to soften the
           taller façade.

           The site has a level difference between
           Portswood and Dock Roads and a creative   The plant selection eases pedestrians through the Dock Road entrance
           design was required to develop planted
           gabion terraces.
                                               time of construction was not optimal,   CEO’s comment
           Landscape installation              and co-ordination was key.
                                                                                David Green, CEO of the V & A Waterfront,
           This was undertaken by the Contours   Irrigation                     says that this project showcases the
           Group, whose scope of work included                                  capabilities of the  Waterfront as a
           soft  landscaping,  hard  landscaping  and   The irrigation system is fully automated,   developer, providing sustainable mixed-
           irrigation. Operations manager Scott   with a rain sensor and moisture   use spaces with the emphasis on both
           Attenborough  says  that  the  site  posed  a   sensor installed to ensure effective   environmental  performance  and  a
           few constraints such as:           and conservative watering of the   company’s greatest asset: its people.  LSA
           •  access restrictions with public road   indigenous plant material. The sensors are
             verges and heritage values having to   programmed to reduce water usage based
             be taken into account for surrounding   on their readings.          Information supplied by Plan-
             buildings;                                                          ning Partners Landscape Ar-
           •  the site footprint was very small and did   Irrigation water is 100% grey water,   chitects, Contours Group, Arup
             not provide adequate stockpiling areas   recycled from  The Ridge building and   and Corporate Image. Photos
             for imported compost and topsoil;  stored in rainwater harvesting tanks. It   courtesy  of  Planning  Partners
           •  delivered products had to be quantified   is filtered through a booster pump and   and Contours Group.
             based on the available area, which at the   pressurised to the desired requirements.




                                                                                     Landscape SA • Issue 103 2021      7
   4   5   6   7   8   9   10   11   12   13   14