Page 15 - Landscape-Issue148
P. 15

PROJECT










































           Aerial view of the Stadium of Life                           Kick4Life uses sport as a tool for social change






















           The structure has set new standards for sustainable construction and environmental responsibility

            In  Loco  is  a  design,  build  and   recently replaced in the form of a donation   Additional facts and features
           entrepreneurship fellowship programme,   by SIS Pitches.              •  There  is  timber  spectator  seating  along
           giving unemployed youth the opportunity   The existing 11-a-side pitch lacked grass   two sides of the pitch, as well as coach and
           to learn how to design and build through   and irrigation, and there was an unbalanced   team seating on either side of the halfway
           a practical, hands-on experience which also   height distribution throughout it; the entire   line;
           includes business training and mentoring.   area was therefore stripped, and levelled   •  the stadium seats 1280 people in total;
           The design was achieved through a   with a fall in three directions – north, west   •  locally  sourced  sandstone  from  Lesotho
           participatory design process with K4L and   and  south. Kou  Construction  created  the   adds a natural touch to the seating, and
           all key stakeholders in the surrounding   new base, thereafter handing over to DISA   a canopy of thin wooden beams provides
           community.                         for  a  final  level  check  and  the  laying  of   shade;
                                              Kikuyu grass.                      •  the  west  and  south  stands  have  a
           Pitch installation                  Resurfacing was undertaken by laying   combined perimeter of 146 metres;
           There are two pitches at the stadium: the   rectangular grass patches on a 50mm layer   •  the  perimeter  fence  is  160  metres,  using
           main 11-a-side grass pitch surrounded by   of topsoil, then adding fertiliser and using   5864 treated Eucalyptus poles;
           the timber stands, and a 5-a-side artificial   a manual roller to reduce the width of the   •  a  solid  fence  runs  along  the  back  of  the
           turf pitch.  The latter’s artificial surface   gaps between the grass patches.  stadium in a zig-zag design, creating a play
           was first installed in 2010 as part of the   An  underground  sprinkler  system  of light and shade;
           Lesotho Football for Hope Centre and has   has been installed for irrigation, and is   •  a pergola creates a shaded area, and will
           been used extensively since then. Having   linked  to  an  existing  borehole.  It  can  be   serve as a structure onto which various
           surpassed its 10 year lifespan, it was   supplemented with mains water.   plants can be trained over time;

           Check us out www.salandscape.co.za                                              Landscape SA • Issue 148  2025    13