Page 15 - Silver Lakes Issue 8_2022
P. 15

SECURITY NEWS



                       BEFORE                                                 AFTER









































        Rebuilding of the electric fence     The existing steel cabinets had rusted and   protection  was  added  in  the  rebuilding
        energiser housing kiosks             were no longer watertight or dust-tight. Over   of  the  equipment.  New  and  properly
        Our  9.2km  perimeter  electric  fence  is   the years, the initial installation inside these   labelled  distribution  board  boxes  were
        being powered by 24 energisers, housed   cabinets  deteriorated  substantially  and   also  installed.  All  the  cabinets  are
        in  steel  cabinets  situated  at  different   were not up to standard. As part of normal   being  locked  with  Keyed  Alike  padlocks
        locations  against  the  perimeter  wall.   maintenance,  and  to  further  enhance  the   with  proper  documented  key  control
        The  electric  fence  is  also  divided  into   integrity  of  our  perimeter  electric  fence,   measures.
        zones  of  approximately  80  metres  in   these energiser cabinets were replaced and
        length  to  enable  the  armed  response   the electronic equipment reinstalled.    Remember: security starts at home.
        security  officer  to  react  to  an  accurate
        destination of an alarm received in the   To avoid unnecessary damage to electronic   Hennie du Plessis
        Security Control room.               equipment,  proper  lightning  and  surge   Security Manager






























                                                                                     INTRAMUROS SEPTEMBER 2022 | 13
   10   11   12   13   14   15   16   17   18   19   20