                                                                  Assuming an average EV has a battery capacity of 50 kWh,
                                                               20 vehicles would provide 1 MWh of storage, and 50 vehicles
                                                               2,5 MWh, so the potential for load shifting using EV batteries is
                                                               large. The only problem is that EVs are only there during working
                                                               hours and cannot be used outside of this period, although it
                                                               may be possible to arrange with the driver that the EV always
                                                               arrives with close to a full charge. 5
                                                                  One example is the Durban conference centre. An energy
                                                               modelling exercise of this site proposes using energy from
                                                               delegates’ EVs during the morning peaks and recharges the
                                                               vehicles in the afternoon. 5

                                                               Green load scheduling 6
                                                               Green load scheduling is a form of short interval load shifting. In
                                                               a commercial building, heating, ventilating, air conditioning and
        Figure 4: Building demand flexibility modes 2          refrigeration (HVAC&R) system, and chiller systems, controlled
                                                               by setpoints and operating on “on/off” modes could activate
                                                               concurrently, resulting in power demand spikes several times in
        A form of modulation known as cycling or scheduling can be   a day.
        applied to the HVAC system to stagger the use of chillers to   While several different approaches to load balancing exist,
        ensure that they are not all running at the same time. Cycling   controlling power consumption by load shifting and load
        does not seriously affect occupant comfort. When more than   shedding, they operate on coarse-grained time scales and do
        one chiller is used, operation can be staggered to reduce the   not help in de-correlating energy demand of individual items.
        maximum demand. For instance, in an installation using four   Load scheduling is an approach for fine-grained scheduling
        chillers, the chillers are cycled at short intervals so that there are   of control systems within an aggregate peak power envelope,
        always three chillers running. HVAC equipment such as chillers   while ensuring the climate conditions required of each system is
        can also be switched off for short periods without affecting   maintained within desired limits. Scheduling can be a complex
        occupant comfort.                                      process, but when applied to a combined system of chillers,
                                                               thermal and electrical storage, could ensure a reduction in
        Load shifting and energy storage                       peak demand by preventing concurrent operation of devices.
        Load shifting is not easy to accomplish in a commercial building   Flexible scheduling would ensure that the schedule changes to
        as most of the activity is responsive to demand or schedules and   accommodate changes in weather and season.
        cannot be moved in time. IT activity for instance cannot be shifted,
        other than bulk back-up or printing operations. Load shifting could   Modulation or frequency response
        be accomplished using energy storage.                  Modulation is the short-term change in demand in response to
                                                               grid signals, to provide grid support services. It involves reducing
        Thermal storage systems                                load for short periods on plant which can tolerate short power
        Thermal storage used with HVAC is quite common. Thermal   breaks, such as chillers, without affecting the comfort or
        storage systems store either cold, in the form of ice used for   convenience of building occupants. Such services would be paid for
        cooling, or heat in the form of hot water used for space heating.   by the grid operator.               n
        Energy is stored when demand is low and consumed when
        demand rises. In a commercial building, this would usually be   References
        outside of business hours, but with the introduction of DER   1.  M Barker: “The Importance of Grid-interactive Buildings”, www.
        systems, surplus energy may be used for thermal storage instead   automatedbuildings.com
        of exporting it to the grid.                           2.  J Salom: “Understanding net-zero energy buildings: Evaluation
                                                                  of load matching and grid interaction indicators”, 12th
        Battery electricity storage systems (BESS)                Conference of International Building Performance Simulation
        Although many industrial complexes are installing bulk electricity   Association, Sydney, 14-16 November 2011.
        storage units, the practice is not extended to commercial   3.  A Roth: “Grid-interactive Efficient Buildings Technical Report
        buildings. Batteries can be charged from either solar PV   Series Whole-Building Controls, Sensors, Modeling, and
        systems or the grid and could be used to reduce the grid load   Analytics.”, www.energy.gov
        during peak periods.                                   4.  RMI: “Grid interactive energy efficient buildings”, Rocky
                                                                  Mountain Institute, 2021.
        Interaction between electric vehicles (EVs) and the building  5.  M Barker: “Modelling a microgrid in Durban”, HVACR Online,
        EVs provide a new factor in the flexible energy sector. Many   February 2019.
        workers still rely on private transport and the average building   6.  M Behl: “Green Scheduling for Energy-Efficient Operation
        provides parking for several vehicles. In an all-EV situation,   of Multiple Chiller Plants”, 33rd IEEE Real-Time Systems
        there could be interaction between the building’s electrical   Symposium (RTSS), 2012.
        system and the EVs’ batteries to supplement the energy