Page 5 - Energize December 2022
P. 5
FROM THE EDITOR Copyright
Change is inevitable 3 Copyright of all material appearing in
energize is vested in EIA Publishing
(Pty) Ltd. In submitting any article for
COVER STORY publication, the authors confirm that
they own the copyright to the said
Investing in tomorrow: Ensuring futureproof energy solutions in an ever-changing market 6 article, which is ceded to EIA Publishing
(Pty) Ltd for publication. The editor
reserves the right to edit or shorten
articles submitted for publication.
INDUSTRY NEWS Editing and/or shortening is done with
Global RE market to be worth almost US$2-billion by 2030 8 due dilligence, where necessary in
conjuction with the author(s).
Feedback from CIGRE Paris Session 2022 10 No part of this publication may
be reproduced, or stored in a retrieval
Eastern Cape government delegation explores renewables 13 system, or transmitted in any form,
Study underway into novel ‘green’ zinc ore refining process 14 or by any means, except as described
below, without the written permission
Komati coal-fired power station shuts down, ready to transition to renewable energy 16 of EIA Publishing (Pty) Ltd. Copying
of articles is not permitted except
for personal and internal use, to the
NEWS extent permitted by South African
law. Permission is not required to
World’s first SF6-free 420 kV gas-insulated switchgear connection 17 make abstracts, on condition that a
full reference to the source is shown.
Acoustic imager technology for partial discharge 18 Requests for permission for other kinds
Ian Kidson retires from Hytec South Africa after 31 years 19 of copying should be addressed to EIA
Publishing (Pty) Ltd.
Highmast off-grid floodlighting for rural applications 20
Disclaimer
To secure power supply in Africa’s longest HVDC link 21 Articles published in energize do not
necessarily reflect the views of EIA
Water fill level monitoring and measurement 22
Publishing (Pty) Ltd or the editor. In
Peace of mind through quality assurance 23 addition, views expressed by the editor
do not necessarily reflect the views of
Popular range of industrial LED luminaires extended 24 EIA Publishing (Pty) Ltd or any other
person or organisation associated with
Global teams meet to strategise in South Africa 25
energize.
SCADA systems are essential for a smart and sustainable water sector 26 It is a condition of publishing
material in energize that EIA Publishing
(Pty) Ltd shall not be liable for any
POWER DEVELOPMENTS IN AFRICA 27 consequential or other damages arising
from the publication in good faith of
any article, advertisement, picture,
comment, view or opinion. This applies
VIEWS AND OPINION to publishing, failing to publish, late
publishing or incorrectly publishing any
Feasibility of Cape Town’s plan to limit load shedding will come down to data 28
article, advertisement, insert, picture,
caption, etc.
It is acknowledged that errors in
TECHNICAL transcript, human and technical errors
can and do occur, but that reasonable
Towards a 100% renewable energy future 29 effort will be made to minimise their
Understanding sports stadium lighting 34 occurence, and to acknowledge
and correct such errors when they
Fuel cell power for critical data sites 37 are brought to the attention of EIA
Publishing (Pty) Ltd.
The nuclear renaissance: Power for the future? 40
energize | December 2022 | 5