Page 45 - Energize May 2022
P. 45

Figure 1: Ecotrades qualified engineers benefit from continuous industry training






                                                                Figure 4: Equipment moved outdoors for better cooling performance







         Figure 2: Racks of equipment




















         Figure 3: 36 000 BTU air-conditioning keeps the high power inverters
         functioning optimally                                  Figure 5: Screen shot of the power analysis screen


        Performance of the Victron remote management              Ecotrades used its own fleet of delivery trucks with hydraulic
        system                                                 lifting gear to maintain propriety of every stage of their installation
        The Hartswater project on the Victron remote management (VRM)   contract. A great deal of time will have been invested in the
        platform can be viewed in real time without visiting the site. The   pre-assembly stage of a bespoke system – so it’s vital to maintain
        ‘advanced’ tab provides an analysis of power input/output, and   integrity between factory and installation site.
        demonstrates how the 25 daisy-chained VE.Can solar charge   The greatest power demand on the farm is from a number
        controllers synchronise their output.                  of 30 to 40 kW water pumps, served by step-up/step-down
           Overall system control is provided by the Cerbo GX. This   transformers. The pumps send water through hundreds of metres
        installation demonstrates how well the new Cerbo GX performs   of hose from the reservoir to sprinkler irrigation outlets.
        even near its design limits with 25 MPPT solar chargers; 6 Fronius   There are also four homesteads on site – all of which now
        solar Inverters; 135 kVA of inverter power; and Solar MD lithium   benefit from the introduction of a reliable energy source.
        batteries with huge capacity, all connected to each device. No
        problems were experienced.                             Relay-triggered generator start
           Incidentally, using VRM one can examine system data for   The Solar MD Lithium batteries in this installation can withstand
        almost any time-range, from the last hour, few hours, day,   being discharged completely more than 4000 times, but last longer
        days, week, month or months, back through the lifetime of the   if they are not depleted below 20% state of charge. For this reason,
        installation. This is really useful when you want to analyse and   the Cerbo GX was programmed to auto-start the generators if this
        compare how a system performs throughout the seasons, or as a   threshold was reached, using one of the on-board relays available
        result of some change or new event.                    for just such a task.



                                                    energize | May 2022 | 43
   40   41   42   43   44   45   46   47   48   49   50