        Advances in partial discharge



        monitoring




        Information from Megger




        Keeping the power on is vital to the success of any network operator, and that means ensuring that
        high voltage assets operate at optimum efficiency.  But partial discharge – a low energy electrical
        discharge that can occur in any insulating medium – can gradually erode insulation resistance in
        transformers, switchgear, generators, motors, cables, and other electrical equipment.







             he cost of subsequent failures   distribution network operators and private or industrial network operators. The suite of
             is likely to be measured in     products was expanded in 2019, with Megger’s acquisition of Power Diagnostix, a German
        Tunplanned outages, missed           specialist in PD testing.
        performance targets and regulatory fines   “We have a wide range of customers, from distribution network operators that might need
        – or possibly in fires, explosions, and   to monitor across an entire region, to customers in the high-tech manufacturing sector, where
        serious injuries. For network operators,   security of supply is vital,” says Tony Wills, applications engineer at Megger.
        monitoring partial discharge (PD) activity   In the UK, networks typically operate HV equipment which was originally installed in the
        is therefore an essential element in safe   1970s and 1980s; PD testing activity is therefore becoming more critical as these assets age.
        and secure operations.               Meanwhile, continuous monitoring technologies, where sensors are clamped to equipment so
           But monitoring assets for PD isn’t   that signals are recorded and uploaded for analysis every few seconds, have been available
        straightforward: it can be linked to faulty   for roughly the past two decades. As a result, Wills notes, these systems are more prevalent
        workmanship in the manufacturing stage,   in countries with a more youthful energy infrastructure, such as in the Middle East and Africa.
        poor site practices at installation, or   However, this type of monitoring is becoming more common in the UK, as assets are replaced
        failures at any point in what is likely to be   or upgraded.
        a long design life. In addition, PD at low
        levels might not trigger a need for action,   How PD testing is conducted
        if the fault falls below levels set out in the   Transformers, switchgear, motors, and
        international standards document IEC   cable installations are typically not easily
        60270, often referred to as the ‘bible’ of   accessible for inspection or repair. However,
        partial discharge measurement.       PD monitoring techniques provide a variety
           Only by monitoring PD levels over   of options to “see” what’s happening inside
        an extended period and identifying and   these valuable assets.
        tracking changes in PD activity as soon as   PD testing exploits the fact that PD
        it occurs, can asset owners be confident   activity emits both sound waves and high
        that they have identified red flag issues,   frequency electromagnetic signals: Megger’s
        or indeed be reassured that their
        equipment is operating at optimum
        efficiency. With the operational integrity
        of valuable assets at stake, owners
        and operators need reliable, easy to
        use testing equipment backed up by
        after-care and expertise.
           Power Diagnostix by Megger,
        known for its range of hand-held PD
        sensors for rapid diagnostic testing,
        has recently expanded its suite of PD
        measuring equipment to meet the testing
        needs of equipment manufacturers,