Page 50 - Energize February 2022
P. 50

Table 2: Licensing and registration for different system types


        What about storage?                  embedded generators installers need to promote the application for connection with
        Storage by itself, charging from the   local electricity distributors and the registration with Nersa. It is the responsibility of
        network and discharging at peak periods   local installers to ensure that their clients are informed of the correct procedure to avoid
        for example, should be considered a   repercussions in the future.
        ‘generator’ subject to Schedule 2 and
        other requirements. Where the storage is   Contact GreenCape, Phone 021 811 0250, energy@green-cape.co.za, https://greencape.co.za
        a component of a system with a primary
        generator, ‘total generator capacity’
        should be determined by the technical
        capabilities of the system:
        •  If the primary generator and the storage
          system can both inject their full capacity
          at the same time, the total should be
          considered.
        •  If the primary generator is an inverter-
          based generator and the storage system
          shares the inverter, the inverter capacity
          will determine the ‘total generator
          capacity’.

        As the embedded generator market
        continues to grow, end-users and     Table 3: Where to find relevant documents for registration and licensing