        Given the LF PF test results, the
        utility performed NB DFR tests on the
        high-side bushings. 1 Hz and 505 Hz
        measurements from this testing are
        provided in Table 2. These tabular results
        affirm the good condition and rating of
        bushings H1 and H2 but escalate the
        assessment of the H3 bushing to an
        ‘investigate’ rating. NB DFR test results
        for bushing H3 (the blue trace in Figure
        1) revealed the following two worrisome
        electrical characteristics so the utility
        replaced the bushing:
        •   A bushing in good condition will
           have an ITC temperature-corrected
           PF value ≤1% at 1 Hz. The ITC
           temperature-corrected 1 Hz PF test
                                             Figure 1: NB DFR measured test results for the high-side 69 kV bushings
           result of bushing H3 was 7,92 %
           (Table 2).
        •   The 10 kV LF PF test result, 1,1%
           (Table 2), and the LF PF test result
           at 250 V, a typical NB DFR test
           voltage, taken from Figure 1, 0,8%,
           are different. This implies a voltage
                                             Table 3: Pre-installation C1 test results for new H3 replacement bushing, 10 kV LF PF and 250 V NB DFR
           dependence of the LF PF test results.

        Before installing in the transformer, LF
        PF and NB DFR testing was performed
        on the H3 replacement bushing to
        confirm its integrity. LF PF and NB DFR
        test results indicated the bushing’s
        good (G) condition (Table 3 and Figure
        2). After replacing the H3 bushing, the
        utility repeated the overall LF PF tests
        on the transformer to observe what
        effect the H3 bushing replacement had
        on the overall HV winding insulation
        test characteristics (Table 4). A notable
        improvement was observed.            Figure 2: Pre-installation NB DFR test results for H3 replacement bushing
           With the problem corrected in the
        overall winding insulation test results, the
        utility staff then complemented their now
        routine procedure with a 10 kV LF PF test
        on the installed H3 replacement bushing
        (Table 5).
           The 10 kV measured LF PF test
        result for the H3 replacement bushing
        was acceptable. However, the ITC
        temperature-corrected LF PF result is
        about 1,5 times the measured value
        while the 1 Hz measured and ITC
                                             Table 4: 10 kV overall transformer LF PF test results after H3 bushing replacement
        temperature-corrected results are nearly
        the same; and the 505 Hz PF test result
        is both non-typical and notably higher
        than the 505 Hz PF test results for the
        H1 and H2 bushings.
           NB DFR tests for the installed H3
        replacement bushing revealed a non-  Table 5: Post-installation C1 test results for H3 replacement bushing, 10 kV LF PF and 250 V NB DFR